Completion & Identification of a Fabrication 
A fabrication is considered complete when initially placed in operation specifically
the
first time it is used in the performance of the task/test for which it was designed. Upon completion of a fabrication, the DPA shall provide a Fabrication Completion Verification Request Form to the Property Management Office (PMO).
Each completed fabrication is “capitalized” in Oracle GA, and a property record, using
the assigned SU ID barcode number, is created in Sunflower Assets (SFA) by the PMO.
Notification that the property record has been created is provided to the Department
Property Administrator (DPA) who subsequently is responsible for the ongoing update
and completeness of the record. Ancillary items or easily removed components, if
taggable, should have a fabrication tag applied with the FAB number, the PO and the line
item number on the PO.
Ongoing maintenance or repair are not included as part of the acquisition cost of the
fabrication. In some cases, the sponsor may approve maintenance or repair as an
allowable direct charge to the project. Should this be the case, it is still excluded from
the acquisition cost of the fabrication.
Upon completion of the fabrication, project personnel should identify any residual
material for potential reassignment
to another fabrication or declare it as excess for final
disposition.
Modifications to Completed Fabrications
Once a fabrication becomes a capitalized asset, enhancements and modifications are
considered upgrades and will be identified separately in the GA system by a new ProjectTaskAward
(PTA) combination.
The completed modification is tagged with an SU.ID barcode, recorded as an asset, or if
applicable, associated with the original fabrication as a child asset.

|
|
|
|
|
|
| |
|
|
|
|
|